 |
 |
| 1. When received, the instrument is unpacked and the serial# is verified. |
2. On the bench being tested and refurbished by an OEM engineer in our lab. |
 |
 |
 |
| 3. Unit is dust wrapped for the crater. |
4. On our truck to the crater. |
 |
 |
 |
| 5. Typical barrier vacuum packing. |
6. Making crates... our crates all use heat treated wood for international shipping. |
 |
 |
 |
| 7. Unloading the truck. |
8. Moving in! |
 |
 |
 |
| 9. On the bench. |
10. Ready to be unwrapped. |
 |
 |
 |
| 11. Passing testing done by the OEM installation engineer. |
12. More tests! |
 |
 |
 |
| 13. Done, ready for a service contract. |
14. The CertSci "Gold Label". |